KTECG is honored to have the opportunity to construct the floating jetty in the compound of Thaketa Logistic Base, Myanmar Oil and Gas Enterprise, for TOTAL E&P Myanmar. The jetty involves the construction of a floating pontoon guided by four marine piles, its access walk-way bridge (gangway), onshore facilities and shore protection for embankment. This jetty with marine piles is the first floating jetty design concept in Myanmar.
The main features of the project are as follow:
Pontoon Particular
Pontoon Dimension – 45 m x 15 m x 1.5 m
Berthing Capacity
Max. Loaded Displacement – 110 MT
Max. Gross Tonnage – 165 GT
Hull plate – ABS Grade-A steel
Structural steel – JIS SS400 Grade
Certified By – BUREAU VERITAS (Singapore)
Marine Dock Pile – 813 mm Ø & 19 mm Thk.
Pier Pile – 508 mm Ø & 12 mm Thk.
Driven by – Antara Koh Piling Barge (Singapore)
Certified By – TECNITAS (Singapore)
Gangway Particular
Landing Bridge – 13.73 m x 2 m
Floating Bridge – 25 m x 2 m
Structural steel – JIS SS400 Grade
Certified By – TECNITAS (Singapore)
Important dates during the construction are as follow:
Pontoon Keel Laying Date : 22nd Feb 2014
Pontoon Launching Date : 12th Jul 2014
Gangway Installation Date : 27th Jul 2014
Projection Completion Date : 19th Aug 2014
The standard and requirement of offshore oil and gas industry is very high. It was a huge challenge to us but we grasped it as an opportunity to improve ourselves and to step into International Oil and Gas Industry. Our team managed to accomplish the project very well in the end. As a result we have been recognized as a pioneer company in the history of the Union of Myanmar.